What Qlira AI does, and what it leaves to you.

The AI keeps the plan current: it replans, reschedules and assigns after every update, reads reports, answers questions and drafts report-outs. The forecast is something you can check, every risk flag shows its evidence, and no plan changes without a person accepting.

  1. 01Runs after every update

    Plans, replans, schedules and assigns

    After every update it recomputes the critical path, forecasts the finish, reschedules the work ahead, scores the actions that recover time and proposes tomorrow’s plan for each crew. People accept, adjust or dismiss.

  2. 02Reads with Claude

    Reads reports and minutes

    Progress reports, meeting minutes and forwarded updates, whatever the format, become dated progress updates and issues mapped to tasks. You review the extraction before any of it is applied.

  3. 03Only from what you may see

    Answers with citations

    Why is this task late? What is waiting on the client? The answer cites the task, report, issue or assessment it comes from, drawn only from what the asker may see.

  4. 04You edit before it sends

    Drafts report-outs

    Weekly, monthly and HSE reports drafted from the KPIs and the log. A person edits and sends; nothing leaves on its own.

  5. 05From your projects only

    Learns how long your work really takes

    From your own finished activities, per company. It is only used once it forecasts better than the plan did, and it keeps learning after each import.

  6. 06Checkable, on purpose

    Forecasts and flags, and shows its work

    The critical path, the finish simulation and the thirteen risk checks give the same answer for the same inputs, and every flag carries its evidence.

KT2·Ask

Why is STR-1188 late?

Grounded in this project’s schedule, reports, issues and event log. Every claim cites its source.

Level 11 columns is 6 working days behind its baseline finish of 9 Feb. Work on gridlines C to E stopped on 10 Feb because rebar cannot be fixed until shop drawing SD-042 rev C is approved [3]; the drawing has been with the consultant for 11 days [3].

The task sits on the critical path with no float [4], so each day of hold moves the Level 12 slab and the structure milestone by a day. The supervisor’s last report shows 78% complete with 6 crew on the remaining gridlines [2].

Escalating the approval is the recommended action; the what-if gains 1.0 day on the finish for each day the hold is shortened [4].

Sources1 Level 11 columns · 78% · paused2 Daily report, Zone B supervisor3 Shop drawing SD-042 rev C awaiting consultant4 Assessment: STR-1188 on the critical path, float 0

Confidence high

Answers with sources

Ask about any task, delay or decision. The answer cites what it used and says how confident it is.

KT2·Assessing the project

Assessing the project

The engine rebuilds the forecast from the live schedule and every report since the last run.

  1. Snapshot1,093 tasks, their links, calendars, daily reports, permits and open deliveries as of today.
  2. Work calendarsWorking days, hours and holidays per task, so durations count site time.
  3. Critical pathForward and backward pass over FS / SS / FF / SF links: early and late dates, float, the critical chain.
  4. Learned durationsHow long this company's activities really take, from its finished work; reported pace overrides it.
  5. Finish simulation300 runs of the remaining work: the likely finish, its range and the chance of a late one.
  6. Risk checks13 checks: pace, float, readiness, blockers, stale reports, permits, supply, forecast. Each with its evidence.
  7. RecommendationsCandidate actions scored by their what-if gain on the finish date.
  8. Write-backDates, float and criticality onto every task, and an event on the log.

Done in 14.8 s. 7 risks flagged, 4 recommendations, forecast +6.5 d against the plan.

Replans in the open

Every step of an assessment is visible while it runs, and the result lands on the last line.

Key functionality by module.

Every change in Qlira is an event on the project’s log, so every module below shares one history and one set of permissions.

KT2·Schedule
Baseline BL R2 · 1 Janbaselineplanned / progresscriticalforecast
Task
03 Structure
STR-1188 Level 11 columns
STR-1240 Level 12 slab pour
STR-1301 Level 13 columns
STR-M03 Structure to L12
05 MEP
MEP-0880 Chilled water risers L10 to L14
MEP-0742 Cable containment L9
06 Finishes
FIN-0410 Blockwork L8
FIN-0322 Screed L7
8 Feb
15 Feb
22 Feb
1 Mar
8 Mar
15 Mar
22 Mar

The live plan

One schedule everyone works from, with the critical path and the forecast finish on the same bars as what the field reported.

KT2·Documents · KT2 BL R3 13-02-27.xer

Activities

1,093

Matched

1,041

New

43

Needs a look

9

In the fileTask
A1240L12 SLAB POUR ZONE A+BSTR-1240
A1188L11 COLUMNS GL A-FSTR-1188
A1305L13 COLUMNS (REV)STR-1301
A2117CHW RISERS L10-14 DELIVERYNew task
A0742CABLE CONTAINMENT L9MEP-0742

Apply as baseline “BL R3 · 13 Feb”. Progress the site has reported is never overwritten.

Imports with a mapping review

Activities matched by id, code, alias or name. You see only the rows that need a decision.

KT2·Insights · open risks

Open risks

2 high · 3 medium

Critical path slippingSTR-1188

Level 11 columns is 6 days behind and drives the finish

“Rebar for gridlines C to E held pending shop drawing approval.”

high
Supply at riskMEP-0880

PO-0417 risers due 21 Feb; supplier delivered 62% of orders on time in 90 days

high
Float nearly goneSTR-1301

Total float down to 1.5 days from 9

medium
No recent reportFIN-0410

Last daily report for Blockwork L8 was 3 days ago

medium
Permit not verifiedMEP-0742

Hot-work permit for cable containment L9 expires tomorrow

medium

Risks with evidence

Thirteen checks covering pace, float, readiness, blockers, stale updates, permits, supply and the forecast. Each flag shows what it saw.

KT2·Today · look-ahead

On the horizon

What starts and finishes next, on the dates the engine forecasts.

Next 3 days

14 – 17 Feb

1 starting · 2 finishing · 1 critical · 1 behind

STR-1188Level 11 columnsFinishes 18 Feb+6 d vs planbehindcritical
MEP-0742Cable containment L9Finishes 17 Feb
FIN-0455Blockwork L9Starts 16 Feb

Next 3 weeks

17 Feb – 7 Mar

3 starting · 2 finishing · 2 critical

MEP-0880Chilled water risers L10 to L14Starts 22 Feb
STR-1240Level 12 slab pourFinishes 4 Mar+6 d vs plancritical
STR-1301Level 13 columnsStarts 1 Marcritical

Next 3 months

7 Mar – 16 May

14 starting · 11 finishing · 2 milestones · 4 critical

STR-M04Structure to L15Milestone 9 Apr+6 d vs plancritical
MEP-M02Chillers energisedMilestone 30 Apr

Three days, three weeks, three months

Starts, finishes and milestones on forecast dates, with critical and behind marked.

KT2·KPIs · S-curve

S-curve

Cumulative progress, weighted by planned hours. Baseline BL R2.

  • Baseline
  • Current plan
  • Actual
  • Forecast

KPIs and the S-curve

Progress, schedule performance, days late and milestones with trends; baseline, plan, actual and forecast on one curve.

Schedule
  • Import from Primavera, Microsoft Project, Excel, PDF and more, with mapping review
  • Baselines; what the field reported is never overwritten
  • Gantt: baseline, plan, progress, critical path, forecast marks
  • Dependency editing (FS / SS / FF / SF), task pages with history
Daily loop
  • Daily updates per task from the phone, with photos and remarks
  • Engineer review with cause tags
  • Next-day plans: issued by the AI, adjusted with a reason, approved
  • Issues and escalations routed up the reporting line
  • Offline saves that replay when the signal returns
Insights
  • Critical path with each task’s own working calendar
  • Likely finish date, its range and the chance of a late finish
  • 13 risk checks, each with its evidence
  • Ranked recommendations with the days each recovers
  • Automatic re-assessment after every change
KPIs
  • Progress, schedule performance, days late, milestones
  • Field, quality and money groups with trends
  • Team table by supervisor and engineer
  • S-curve: baseline, plan, actual, forecast
  • Cash-flow curve
Notifications
  • Derived from the event log, never from a button
  • In-app, email and web push
  • Per-person preferences and muted categories
Safety
  • Permits requested, verified, rejected; missing permits flagged by the engine
  • Daily duties checklist, observations, incidents with investigations
  • Training register, HSE daily / weekly / monthly report-outs
Procurement
  • Suppliers with 90-day reliability
  • Requisitions, quotes, award, purchase orders in five states
  • Deliveries; supply risk on the critical path flagged by the engine
Accounting
  • Cost lines and ledger with after-close audit
  • Applications and variations, petty cash
  • Month close with a checklist; time and cost verdict on the KPIs
Deployment
  • Hosted, or on your own servers
  • Roles are data: rename and re-permission any of the ten templates
  • Single sign-on, audit export

Start with one project.

Tell us about your projects and the tools you plan in. We set your team up, bring in a schedule and walk you through the first assessment together.